Patent · US Active

Scheduling workload service operations using value increase scheme

US10489198B2 · kind B2 · utility

0Cited by
0References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 16, 2017
Grant dateNov 26, 2019
Priority date
Expiry dateApr 14, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q30/04
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

An example method includes receiving a nominal equivalent resource usage data, an infrastructure usage data, an effective production capacity, a demand elasticity curve, and workload scheduling constraints across a plurality of accounts. The method includes calculating an equivalent resource utilization based on the nominal equivalent resource usage data, the infrastructure usage data, and the effective production capacity. The method includes calculating a potential value increase for a service based on the workload scheduling constraints, the nominal equivalent resource usage data, the effective production capacity, and the demand elasticity curve. The method includes calculating a value increase scheme for the service based on the potential value increase and sending the value increase scheme to a user workload device. The method includes receiving a workload constraint from the user workload device and scheduling a workload service operation based on the infrastructure usage data, the value increase scheme, and the workload constraint.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.