Patent · US Active

Peak power control and sequencing for multiple power supplies

US10496145B2 · kind B2 · utility

0Cited by
1References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 27, 2015
Grant dateDec 3, 2019
Priority date
Expiry dateAug 27, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F1/3203
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Systems, apparatuses, and methods may include a first power source to output power at a first normal power level and a first peak power level and a second power source cooperating with the first power source to output power at a second normal power level and a second peak power level. A system peak power control unit may monitor workload power requirements and cause the first power source to output the first peak power level at a first time period and cause the second power source to output the second peak power level at a second time period, different from the first time period. The time periods may be contiguous or discontiguous.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.