Optimized precooling of structures
US10544951B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 8, 2017 |
| Grant date | Jan 28, 2020 |
| Priority date | — |
| Expiry date | Feb 10, 2038 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B2219/2614
- WIPO fieldThermal processes and apparatus
- WIPO sectorMechanical engineering
Abstract
A method includes aggregating multiple zones of an indoor structure, each zone having associated comfort limits, formulating an aggregated single zone model predictive control (MPC) problem representative of the multiple zones for a heating ventilation and air conditioning (HVAC) system, determining optimal aggregated actions as a function of the aggregated single zone model predictive control problem, simulating an optimal trajectory of indoor qualities, and determining zone temperature setpoints to comply with the comfort limits for each zone and pre-cool the indoor structure.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.