Patent · US Active

System and method for intelligent project schedule forecasting

US10572848B2 · kind B2 · utility

7Cited by
4References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 16, 2014
Grant dateFeb 25, 2020
Priority date
Expiry dateJul 11, 2037

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06T11/206
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems, methods, and other embodiments for providing scheduling of activities of a project plan associated with a computer application are described. In one embodiment, a project scheduling tool is configured to calculate a percentage time deviation, between an updated time duration and a planned time duration, for each present activity of a project to form a plurality of percentage time deviations. An arithmetic mean of the plurality of percentage time deviations is calculated and a planned time duration of at least one future activity of the project, related to each present activity, is transformed based on the arithmetic mean.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.