Patent · US Active

Resource allocation and scheduling for batch jobs

US10592280B2 · kind B2 · utility

12Cited by
32References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 23, 2016
Grant dateMar 17, 2020
Priority date
Expiry dateMay 22, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5072
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A scheduler of a batch job management service determines that a set of resources a client is insufficient to execute one or more jobs. The scheduler prepares a multi-dimensional statistical representation of resource requirements of the jobs, and transmits it to a resource controller. The resource controller uses the multi-dimensional representation and resource usage state information to make resource allocation change decisions.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.