Systems and methods for generating scheduling options in consideration of elements within a construction site
US10600010B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 15, 2013 |
| Grant date | Mar 24, 2020 |
| Priority date | — |
| Expiry date | Nov 24, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q50/08
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Systems and methods for generating scheduling options in consideration of space and resource constraints in accordance with embodiments of the invention are disclosed. One embodiment of the invention includes a scheduling application that configures the processor to generate a project schedule from a TODO list comprising a plurality of construction operations, where the construction operations comprise at least one specific space requirements within a construction site, resource requirements, and a duration time.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.