Patent · US Active

Building management system with multi-dimensional analysis of building energy and equipment performance

US10648692B2 · kind B2 · utility

2Cited by
17References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 22, 2017
Grant dateMay 12, 2020
Priority date
Expiry dateFeb 6, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06T2200/24
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A building management system includes building equipment, a metrics engine, and a visualization module. The building equipment is configured to provide raw data samples of one or more data points. The metrics engine is configured to collect the raw data samples, and calculate a first metric, a second metric, and a third metric as a function of the raw data samples. The visualization module is configured to correlate the first metric to a first dimension value, the second metric to a second dimension value, and the third metric to a third dimension value. The visualization module is also configured to generate a graphical visualization in which the first dimension value is displayed as a first dimension of the graphical visualization, the second dimension value is displayed as a second dimension of the graphical visualization, and the third dimension value is displayed as a third dimension of the graphical visualization.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.