Multi-RPO data protection
US10657006B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 8, 2016 |
| Grant date | May 19, 2020 |
| Priority date | — |
| Expiry date | Aug 8, 2036 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2201/855
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A system for disaster recovery including a controller (i) for controlling bandwidth usage of a disaster recovery system in accordance with a plurality of recovery point objectives (RPOs), each RPO designating a maximal time loss constraint for data recovery for an enterprise production system, and a corresponding bandwidth allocation for the disaster recovery system to use in replicating data for the enterprise production system, wherein the RPOs are applied in accordance with a calendar-based schedule of dates and times, and (ii) for issuing an RPO alert when the RPO maximal time loss constraint for a current date and time is not satisfied.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.