Patent · US Active

Uplink transmission power allocation

US10660077B2 · kind B2 · utility

13Cited by
1References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 9, 2019
Grant dateMay 19, 2020
Priority date
Expiry dateAug 9, 2039

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04W72/56
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Apparatuses, methods, and systems are disclosed for uplink transmission power allocation. One method includes: determining a transmission time for a first transmission (“FT”); determining first transmissions overlapping with the FT that start before a start time (“ST”) of the FT; determining a cut-off time (“COT”) for power determination; determining second transmissions overlapping with the FT that start at or later than (“SAOLT”) the ST; scheduling information and/or transmission information for the second transmissions is known at or before the COT; determining third transmissions that overlap with the FT that SAOLT the ST; scheduling information and/or transmission information for the third transmissions is known after the COT; allocating FT power based on a maximum total transmission power for the first transmissions and a minimum guaranteed power corresponding to the second transmissions and/or the third transmissions; and performing the FT using the FT power.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.