Patent · US Active

Computing infrastructure resource-workload management methods and apparatuses

US10666570B2 · kind B2 · utility

0Cited by
4References
24Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 28, 2016
Grant dateMay 26, 2020
Priority date
Expiry dateSep 16, 2038

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L67/1031
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Apparatuses and methods associated with management of computing infrastructure resources and workloads are disclosed herein. In embodiments, an apparatus may comprise a resource-workload manager having: a placement solution generator to generate a plurality of potential resource placement solutions for allocation of various resources of the computing infrastructure to various workloads; one or more utility function calculators to calculate one or more values for one or more provider-centric attributes, and one or more values for one or more customer-centric attributes, for the plurality of potential solutions; an analyzer to analyze the attributes and select one of the potential resource placement solutions; and a resource allocator to allocate the resources, based at least in part on the selected resource placement solution. Other embodiments may be described and/or claimed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.