Structure for monitoring stability of existing subgrade/slope and construction method thereof

US10684112B2 · kind B2 · utility

0Cited by
7References
7Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 29, 2017
Grant dateJun 16, 2020
Priority date
Expiry dateMar 26, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01N33/24
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

The structure has a subgrade or slope to be monitored and strip-shaped smart geosynthetic material compound devices. The strip-shaped smart geosynthetic material compound devices are buried to run through a subgrade or slope predicted slip crack surface. Gaps between the strip-shaped smart geosynthetic material compound devices and borehole inner walls are filled so that the force environment of the strip-shaped smart geosynthetic material compound devices is close to the subgrade or slope internal environment. Each strip-shaped smart geosynthetic material compound device has a strip-shaped geogrid, lead, and heat shrinkable tube. The lead is arranged in a length direction of the geogrid, and the lead and geogrid are fixedly connected at an interval of a set distance, with each fixed point forming a measuring point. The geogrid is wrapped in the heat shrinkable tube, and a free end of the lead is drawn out of the heat shrinkable tube.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.