Pole vault pit construction
US10688331B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 15, 2018 |
| Grant date | Jun 23, 2020 |
| Priority date | — |
| Expiry date | Oct 3, 2038 |
Classification
- Technology area (CPC A)Human Necessities
- CPC primaryA63B2210/50
- WIPO fieldFurniture, games
- WIPO sectorOther fields
Abstract
A pole vault pit construction that is formed of multiple resilient foam blocks that are secured in a unitary manner and wherein thee construction is comprised of a front cutout section defining a recess for receiving a pole engager, said front cutout section having an open front end and an inner end, and a contiguous rear landing section. The plurality of foam blocks of the front cutout section include at least one pair of opposed position blocks each having a tapered surface commencing from the upper surface downwardly to the lower surface and in a direction toward the opposed position block so that a cross-section of the recess is essentially trapezoidal. The rear landing section includes at least a center foam block having an uninterrupted tapered surface commencing from the upper surface downwardly to the lower surface and in a direction toward the open front end of the recess.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.