Patent · US Active

Subterranean formation fracking and well workover

US10689938B2 · kind B2 · utility

1Cited by
24References
25Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 10, 2018
Grant dateJun 23, 2020
Priority date
Expiry dateAug 10, 2038

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/05
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

While a fracturing stack on a well is at fracturing pressure, receiving a perforating string in a section of the center bore of the fracturing stack. The section is a section above a fracturing head of the fracturing stack. While the fracturing stack is at fracturing pressure, sealing the section of the center bore to maintain a fracturing pressure in and below the fracturing head. Equalizing pressure in the section to atmospheric pressure. Receiving, at atmospheric pressure, a well drop in the section. Equalizing pressure in the section to pressure in the fracturing stack below the section. Releasing the well drop into the center bore of the fracturing head and to the well.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.