Patent · US Active

Collaborative working of business process management methods

US10726361B2 · kind B2 · utility

0Cited by
4References
14Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 21, 2010
Grant dateJul 28, 2020
Priority date
Expiry dateJan 11, 2032

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/063
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

The collaborative working of process-oriented and event-based business process management (BPM) methods in a service-oriented architecture (SOA) is supported. The execution models of the business process include process-oriented execution models and event-based execution models. The process-oriented execution models and the event-based execution models are executed at runtime. A bridge implements the interaction between the process-oriented runtime execution and the event-based runtime execution.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.