Managing proof assets for validating program compliance
US10726373B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 10, 2019 |
| Grant date | Jul 28, 2020 |
| Priority date | — |
| Expiry date | Jun 10, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/10
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A program model that includes requirements and control objects associated with requirements, workflows, proof assets. Workflow tasks associated with the workflows may generate requests to collect each proof asset associated with the control objects. Workflow tasks may validate each collected proof asset based on the plurality of control objects associated with each collected proof asset. Workflow tasks may determine completed control objects based on the validated proof assets. Workflow tasks may employ an amount of the completed control objects that is equivalent to the amount of the control objects associated with the program model to provide a report indicating that the requirements associated with the program model may be satisfied. Workflow tasks may employ detection of modifications to the validated proof assets to determine a portion of the workflow tasks based on the modified proof assets such that the portion of the workflow tasks may be re-executed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.