System and method for multi-site cellular manufacturing with transportation delays

US10732913B2 · kind B2 · utility

0Cited by
11References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 9, 2011
Grant dateAug 4, 2020
Priority date
Expiry dateJul 2, 2035

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04N1/32545
  • WIPO fieldAudio-visual technology
  • WIPO sectorElectrical engineering

Abstract

A system and method is used to manage scheduling of a plurality of print jobs in a multi-site print shop environment. The multi-site environment includes a plurality of print shops each having resources and equipment to complete at least one type of print job. Also included is a multi-site scheduler configuration arranged to assign and schedule print jobs to one of a home shop and a non-home shop. The assigning and scheduling is based on a fastest completion time, wherein a completion time of a print job in a home shop is defined as the actual time taken to complete the print job and a completion time of a print job in a non-home shop is defined as the actual time taken to complete the print job and a transportation delay.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.