Focus aware productivity tool
US10733549B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 15, 2015 |
| Grant date | Aug 4, 2020 |
| Priority date | — |
| Expiry date | May 11, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/1093
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Techniques for managing a user's tasks based on the user's focus level. High focus time slots are identified during which the user has a high level of focus, as well as low focus time slots during which the user has a low level of focus. Tasks for completion by the user are scheduled such that the high focus time slots are allocated to tasks that require a high level of user focus, and the low focus time slots are allocated to tasks that require a low level of user focus. High focus times may be identified based on user indications and/or on biometric data describing the user's physical state. Interruption requests may also be managed based on the user's focus level. Necessary resources may be pre-loaded prior to the high focus time periods, and breaks may be automatically scheduled to maintain the user's high level of focus.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.