Patent · US Active

Building energy system with stochastic model predictive control

US10739742B2 · kind B2 · utility

3Cited by
1References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 26, 2018
Grant dateAug 11, 2020
Priority date
Expiry dateAug 3, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG05B2219/2642
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A building energy system includes equipment and an asset allocator configured to determine an optimal allocation of energy loads across the equipment over a prediction horizon. The asset allocator generates several potential scenarios and generates an individual cost function for each potential scenario. Each potential scenario includes a predicted load required by the building and predicted prices for input resources. Each individual cost function includes a cost of purchasing the input resources from utility suppliers. The asset allocator generates a resource balance constraint and solves an optimization problem to determine the optimal allocation of the energy loads across the equipment. Solving the optimization problem includes optimizing an overall cost function that includes a weighted sum of individual cost functions for each potential scenario subject to the resource balance constraint for each potential scenario. The asset allocator controls the equipment to achieve the optimal allocation of energy loads.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.