Data processing system test suite management including dynamic resource reallocation and reconfiguration
US10740224B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 14, 2018 |
| Grant date | Aug 11, 2020 |
| Priority date | — |
| Expiry date | Jan 31, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/22
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
In response to receiving a test suite specification, a processor of a testing platform determines a schedule of execution of a test suite to test a system under test (SUT). The SUT has a hardware resource set including at least one of a set including a processor system and a data storage system, and the test suite includes a plurality of tests, each including a respective set of one or more testcases. The processor initiates execution of the test suite on the SUT in accordance with the schedule. In response to failure of a hardware resource during execution of the test suite, the processor automatically and dynamically reallocating a test in the test suite to at least one different hardware resource in the hardware resource set.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.