Managing a workflow for an oilfield operation
US10740730B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 28, 2013 |
| Grant date | Aug 11, 2020 |
| Priority date | — |
| Expiry date | Jun 28, 2033 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/267
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Various implementations described herein are directed to a method for managing a workflow for an oilfield operation. The method may include receiving a request to perform the task workflow. The method may also include loading an adapted task workflow based on historical information. The method may further include receiving an input pertaining to one or more tasks of the adapted task workflow. In addition, the method may include determining whether the one or more tasks have been completed based on the received input.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.