Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation
US10769326B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Jan 31, 2019 |
| Grant date | Sep 8, 2020 |
| Priority date | — |
| Expiry date | May 15, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F17/16
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Computer processing time and results are improved in fully-coupled fully-implicit well-reservoir simulation system using Jacobian matrix methodology. Approximate inverse preconditioners are provided which treat a well influence matrix at comparable accuracy and robustness to those for the grid-to-grid flow terms of system matrix. The methodology is highly parallelizable and the data processing can be performed faster, as fewer solver iterations are required to converge to the same acceptable tolerances.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.