Test manager to coordinate testing across multiple test tools
US10776253B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 2, 2018 |
| Grant date | Sep 15, 2020 |
| Priority date | — |
| Expiry date | Oct 12, 2038 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3672
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
In some examples, a server may perform various operations, including receiving a set of tests to be performed across multiple software components, receiving one or more inputs, selecting a first test of the set of tests, instructing a first test tool to perform the first test on a first software component using the one or more inputs, and receiving first results from the first test tool performing the first test to the first software component using the one or more inputs. The multiple software components may include at least the first software component written in a first language and tested with the first test tool and a second software component written in a second language and tested with a second test tool. The operations may include selecting a second test, instructing a second test tool to perform the second test to a second software component, and receiving second results.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.