Unified test automation system
US10783065B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 23, 2018 |
| Grant date | Sep 22, 2020 |
| Priority date | — |
| Expiry date | Mar 23, 2038 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3698
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
An automated testing framework to coordinate functions among code management, build management, automated test, resource reservation, artifact repositories and team communication subsystems. In one embodiment specific to software development, software developers check new code into a code management subsystem, a development project tracking system, or other tools that automatically generate a build. Test suites are then automatically selected and executed based on a scope of the project or code that was built. This scope can include such attributes as what portion of the software was built, the purpose (objective) of the build, the maturity of developing that build, and so forth. In one implementation, label directives may be used to associate build scope to test suites. During or after the automated tests, other actions may then be automatically triggered, to store test results, inform the development team, stored data integrated with test definition and results, or update an artifact respository.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.