Abstract
Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e. a cyclic filling interval, according to an existing excavation technical condition of a mining shaft; when the new excavation roadway is excavated, performing supporting for a roof, a floor and an inner side of a roadway by using a strong bolt and bolt-mesh-cable; then, after the new excavation roadway is excavated for the cyclic filling interval, starting to perform roadway-expanding excavation along an outer side of the roadway; when roadway-expanding excavation is performed, performing temporary supporting for a filling strip and a junction of the filling strip and the new excavation roadway by using a single hydraulic prop in cooperation with a metal articulated roof beam; finally, after roadway-expanding excavation is completed, removing temporary supports and filling the filling strip; afterwards, the…
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.