Patent · US Active

Method of performing complex fracture operations at a wellsite having ledged fractures

US10794154B2 · kind B2 · utility

0Cited by
13References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 5, 2016
Grant dateOct 6, 2020
Priority date
Expiry dateAug 5, 2036

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/10
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of performing a fracture operation at a wellsite is disclosed for a wellsite positioned about a subterranean formation having a wellbore therethrough and a fracture network therein. The fracture network includes natural fractures. The method involves generating wellsite parameters of the wellsite comprising seismic measurements, generating smooth fracture parameters of a smooth fracture by solving governing equations based on the wellsite parameters, and generating ledged fracture parameters of a ledged fracture by identifying ledge locations and generating ledged fracture parameters of a ledged fracture at the ledge locations by solving the governing equations based on the wellsite parameters for the ledge locations.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.