Patent · US Active

Updating a topology of a distribution network by successive reallocation of the meters

US10802056B2 · kind B2 · utility

3Cited by
1References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 14, 2016
Grant dateOct 13, 2020
Priority date
Expiry dateOct 13, 2037

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S40/20
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

There is proposed a computer-implemented method for automatic correction of a topology of a smart network that uses the information contained in the voltage measurements provided by smart meters in order to determine which meter is connected to which transformer. The method starts from an initial topology and divides up the meters into first and second batches for each transformer. Successive reallocations of meters in the second batches are made according to similarities with average voltages calculated and corrected from the first batches of meters. The method proceeds by iterations until there remain no more meters attributable to other transformers and updates the topology so that its evolution at a given time be readable.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.