Patent · US Active

Method for cemented material dam construction based on whole-process quality control

US10815631B1 · kind B1 · utility

1Cited by
6References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 29, 2020
Grant dateOct 27, 2020
Priority date
Expiry dateMay 29, 2040

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02A20/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for cemented material dam construction based on whole-process quality control includes: determining a water-binder ratio of a sand and gravel material through a simulation test; laying rockfill on the first cemented sand and gravel layer before the final setting time of the first cemented sand and gravel layer; adjusting the maximum particle size of the rockfill and the distance between the particles in the rockfill according to the design requirements; spraying a cement slurry on the rockfill to wrap all the particles in the rockfill and laying a second cemented sand and gravel layer before the initial setting time of the cement slurry; performing rolling compaction on the construction layer until the decline in the thickness of the construction layer and the apparent density of the rolled surface meet the design requirements; and completing the cemented material dam construction.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.