Patent · US Active

Method for short-term generation scheduling of cascade hydropower plants coupling cluster analysis and decision tree

US10825113B2 · kind B2 · utility

0Cited by
0References
3Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 16, 2018
Grant dateNov 3, 2020
Priority date
Expiry dateMar 16, 2038

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S10/50
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

The invention relates to the field of hydropower scheduling, and relates to a method for short-term generation scheduling of cascade hydropower plants coupling cluster analysis and decision tree. Linear regression technique is adopted to determine a matching relationship of energy production between upstream and downstream hydropower plants. With the relationship, typical generation curves of each hydropower plant can be clustered from lots of historical data. These typical generation curves and impact factors of generation scheduling such as planned daily electricity, reservoir level, and power grid characteristics, are together trained to obtain decision-making library for generation scheduling of cascaded hydropower plants. Thus, the decision tree method can be used to rapidly determine an operational scheme for generation scheduling of cascaded hydropower plants. Finally, a correction strategy for operation constraints is introduced to ensure feasibility of the operation scheme. The invention can quickly obtain generation schedules of cascade hydropower plants.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.