Rules based decomposition of tasks for resource allocation
US10853144B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 9, 2018 |
| Grant date | Dec 1, 2020 |
| Priority date | — |
| Expiry date | Oct 31, 2038 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3409
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
According to examples, an apparatus may include a processor and a memory on which are stored machine readable instructions that when executed by the processor, cause the processor to identify a plurality of tasks, identify a plurality of resources configured to execute the tasks, and decompose the plurality of tasks into multiple groups of tasks based on a plurality of rules applicable to the multiple groups of tasks. The instructions may also cause the processor to, for each group in the multiple groups of tasks, model the group of tasks and a subset of the plurality of resources as a respective resource allocation problem and assign a respective node of a plurality of nodes to solve the resource allocation problem.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.