Methods for feedback-based optimal workload scheduling and devices thereof
US10871988B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 17, 2017 |
| Grant date | Dec 22, 2020 |
| Priority date | — |
| Expiry date | Apr 27, 2038 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2209/503
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Methods, non-transitory computer readable media, and workload scheduler devices that determine one of a plurality of task categories for a received task. A stored expected runtime for each of a plurality of CPUs to execute one standard computation unit (SCU) in the determined one of the plurality of task category is obtained. One of the plurality of CPUs is selected based on the stored expected runtime. The task is dispatched to the selected one of the plurality of CPUs for execution. Accordingly, with this technology, tasks associated with workloads can be more effectively dispatched and more effectively processed by a CPU pool.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.