Patent · US Active

Methods for feedback-based optimal workload scheduling and devices thereof

US10871988B1 · kind B1 · utility

3Cited by
1References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 17, 2017
Grant dateDec 22, 2020
Priority date
Expiry dateApr 27, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/503
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Methods, non-transitory computer readable media, and workload scheduler devices that determine one of a plurality of task categories for a received task. A stored expected runtime for each of a plurality of CPUs to execute one standard computation unit (SCU) in the determined one of the plurality of task category is obtained. One of the plurality of CPUs is selected based on the stored expected runtime. The task is dispatched to the selected one of the plurality of CPUs for execution. Accordingly, with this technology, tasks associated with workloads can be more effectively dispatched and more effectively processed by a CPU pool.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.