Patent · US Active

Time-aware method of scheduling application tasks in a green data center

US10871993B2 · kind B2 · utility

1Cited by
1References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 10, 2017
Grant dateDec 22, 2020
Priority date
Expiry dateMay 24, 2038

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A time-aware method of scheduling application tasks in a green data center (GDC) using a task scheduling processor and an energy collecting processor connected to one or more renewable energy sources and a grid power source. The method includes receiving energy data regarding available energy from renewable energy resources such that the renewable energy source is used first then receiving the application tasks and determining a service rate for servers to process the application tasks by using a service rate obtained by solving a profit maximization problem for the GDC by prioritizing and immediately scheduling or removing certain application tasks. The method also includes determining an initial fitness level of each representative application task based on total revenue of the GDC, an energy cost of the GDC, and a penalty associated with violated constraints. The application tasks are formulaically scheduled to be executed in one or more of the servers such that the application tasks maximize a profit in the GDC while guaranteeing delay constraints.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.