Patent · US Active

Geomechanical risk and hazard assessment and mitigation

US10872183B2 · kind B2 · utility

0Cited by
5References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 17, 2017
Grant dateDec 22, 2020
Priority date
Expiry dateNov 23, 2038

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B7/04
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Examples of techniques for geomechanical risk and hazard assessment and mitigation are disclosed. In one example implementation, a method may include generating, by a processor, a geomechanical model for a location for drilling a borehole; performing a risk assessment to identify at least one risk associated with drilling the borehole; updating, by the processor, the geomechanical model as a pre-drill updated geomechanical model by applying a mitigation solution to mitigate the at least one risk associated with drilling the borehole; generating, by the processor, a drilling plan for drilling the borehole based on the pre-drill geomechanical model; and drilling the borehole based on the drilling plan.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.