Patent · US Active

Process improvement through the addition of power recovery turbine equipment in existing processes

US10876431B2 · kind B2 · utility

0Cited by
39References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 28, 2019
Grant dateDec 29, 2020
Priority date
Expiry dateOct 28, 2039

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF05D2220/762
  • WIPO fieldBasic materials chemistry
  • WIPO sectorChemistry

Abstract

Power recovery turbines can be used debottlenecking of an existing plant, as well as recover electric power when revamping a plant. A process for recovering energy in a petroleum, petrochemical, or chemical plant is described. A fluid stream having a first control valve thereon is identified. A first power-recovery turbine is installed at the location of the first control valve, and at least a portion of the first fluid stream is directed through the first power-recovery turbine to generate electric power as direct current therefrom. The electric power is then recovered.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.