Fuel preparation reaction system, peak regulation system for power generation plant and power generation plant
US10900130B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 30, 2017 |
| Grant date | Jan 26, 2021 |
| Priority date | — |
| Expiry date | Aug 30, 2037 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E70/30
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A fuel preparation reaction system includes: an electrolytic hydrogen production equipment connected to a power supply device of a power generation plant and configured to produce hydrogen through electrolysis with surplus power from peak regulation of the power generation plant as a power supply; a fuel preparation reaction equipment configured to produce fuel with hydrogen and carbon dioxide; an input end of the fuel preparation reaction equipment is connected to a hydrogen output pipe of an electrolytic hydrogen production device, while another input end is connected to a supply source of carbon dioxide, a fuel output port being connected to a fuel collection device or a fuel utilization device. The system can directly consume peak-regulation power from a power plant, thereby improving power grid balance and differences between peaks and valleys, while achieving phase-changed storage of electric energy and effective usage of energy.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.