Installing a tubular string through a blowout preventer
US10900310B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 12, 2018 |
| Grant date | Jan 26, 2021 |
| Priority date | — |
| Expiry date | Dec 31, 2038 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B33/063
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A tubular string is cut using a severing system deployed from the rig floor inserted through the BOP into the tubular string and landed in a fit-for-purpose wellhead. The cutting operation forms an excess tubular string and a remaining tubular string. Once cut, the excess tubular string is removed through the BOP. The system and its use eliminates the need to perform a cutting operation at the wellhead by personnel under the rig floor and the need for removal of the BOP thus reducing cost, saving time, and eliminating the inherent risk attendant with these operations.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.