Energy harvest split core design elements for ease of installation, high performance, and long term reliability
US10901008B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 4, 2016 |
| Grant date | Jan 26, 2021 |
| Priority date | — |
| Expiry date | May 9, 2038 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10T29/49117
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A power distribution monitoring system is provided that can include a number of features. The system can include a plurality of power line sensing devices configured to attach to individual conductors on a power grid distribution network. In some embodiments, the power line sensors can include a split-core transformer. In some embodiments, a power line sensing device is disposed on each conductor of a three-phase network. The sensing devices can be configured to measure and monitor, among other things, current and electric-field on the conductors. Methods of installing, sealing, and protecting the split-core transformers of the power line sensors are also discussed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.