Nuclear power plant spent fuel negative pressure unloading system
US10902962B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 31, 2015 |
| Grant date | Jan 26, 2021 |
| Priority date | — |
| Expiry date | Oct 24, 2036 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E30/30
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
A nuclear power plant spent fuel negative pressure unloading system comprises a fuel element transport pipe and a gas transport pipe. The fuel element transport pipe comprises a fuel element output pipe, a fuel element lifting pipe, and a fuel element unloading pipe connected in series. The fuel element unloading pipe is arranged obliquely downward in the direction of fuel element movement. The distal end of the fuel element unloading pipe is connected sequentially to fuel loading apparatus and a transfer apparatus. Two nozzles of the gas transport pipe are connected to set positions on the fuel element output pipe and the fuel element unloading pipe respectively. A gas driving mechanism is connected to the gas transport pipe. An inlet of the gas driving mechanism is arranged at one end in proximity to the fuel element unloading pipe.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.