Patent · US Active

Electrical power systems

US10916930B2 · kind B2 · utility

0Cited by
2References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 1, 2017
Grant dateFeb 9, 2021
Priority date
Expiry dateNov 4, 2037

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH02H7/26
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

In the field of electrical power systems there is provided a method of supervising the operation of a plurality of current transformers that are arranged in respective current transformer within differing protection zones of a multi-phase electrical power system. The method of supervising comprises the steps of: (a) identifying a faulty protection zone within the electrical power system; (b) identifying a faulty current transformer group within the faulty protection zone; and (c) identifying faulty phase(s) within the faulty current transformer group within the faulty protection zone.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.