System and method for completing and stimulating a reservoir
US10920530B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 29, 2016 |
| Grant date | Feb 16, 2021 |
| Priority date | — |
| Expiry date | Dec 25, 2037 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B2200/06
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A technique facilitates completion and stimulation of a reservoir, e.g. a lower tertiary reservoir. Initially a wellbore is drilled into the tertiary reservoir. Following drilling, the wellbore is completed by deploying completion equipment constructed to facilitate stimulation of the tertiary reservoir. The completion equipment may be operated in conjunction with a stimulation system to stimulate the tertiary reservoir and thus to enhance retrieval of hydrocarbon fluids contained within the tertiary reservoir.