Optimization device for production line
US10925201B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 9, 2017 |
| Grant date | Feb 16, 2021 |
| Priority date | — |
| Expiry date | Mar 3, 2037 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/02
- WIPO fieldAudio-visual technology
- WIPO sectorElectrical engineering
Abstract
An optimization device is applied to a production line in which multiple production devices respectively execute a production process. The optimization device includes a cycle time setting section configured to set a cycle time for each production device, a target time setting section configured to set a target time based on a cycle time and a time required for periodic operation in each of multiple production devices except for the component mounter, and a line design section configured to calculate the unit number of the component mounters constituting the production line based on the target time.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.