Patent · US Active

Scheduling a computational task for performance by a server computing device in a data center

US10928845B2 · kind B2 · utility

1Cited by
9References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 31, 2018
Grant dateFeb 23, 2021
Priority date
Expiry dateJan 25, 2039

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06V20/13
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Described herein are various technologies pertaining to predicting an amount of electrical power that is to be generated by a power system at a future point in time, wherein the power system utilizes a renewable energy resource to generate electrical power. A camera is positioned to capture an image of sky over a geographic region of interest. The image is analyzed to predict an amount of solar radiation that is to be received by the power source at a future point in time. The predicted solar radiation is used to predict an amount of electrical power that will be output by the power system at the future point in time. A computational resource of a data center that is powered by way of the power source is managed as a function of the predicted amount of power.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.