Scaling out a hybrid cloud storage service
US10942829B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 13, 2019 |
| Grant date | Mar 9, 2021 |
| Priority date | — |
| Expiry date | Apr 10, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2201/82
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Software and resources, pre-deployed in accordance with a disaster recovery policy, are placed in a standby state to provide rapid disaster recovery in a cloud storage environment. When a disaster recovery situation is detected, (for example a loss of access to primary data), the pre-deployed resources are immediately activated according to the disaster recovery policy to provision and re-configure adequate resources and rapidly restore access to the data (such as restoring data from cloud backup storage). A disaster recovery situation may involve, for example, loss of hardware availability, network bandwidth interruption, or a sudden and large unforeseen jump in storage retrieval request volume (for example a recall storm).
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.