Method and system for workload balancing of a production line
US10948902B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 14, 2019 |
| Grant date | Mar 16, 2021 |
| Priority date | — |
| Expiry date | Sep 12, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06316
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
Methods and a system include getting, for each variant, input on a probability of occurring and inputs on a variant assigned workload time for a given resource. For each resource of the line, each variant is represented with a graphic object having a first measurable parameter representing the variant probability and a second measurable parameter representing the variant assigned workload time. At least one resource requiring workload balancing on a specific variant is determined by taking into account a combination of the first measurable parameter and the second measurable parameter of the specific variant.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.