Patent · US Active

Dynamic resource scaling and VM migration in NG-RAN

US10952265B2 · kind B2 · utility

1Cited by
0References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 24, 2019
Grant dateMar 16, 2021
Priority date
Expiry dateSep 12, 2039

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04W88/085
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Systems and methods of modifying the bearer context of a DRB of an E1 interface for a gNB are described. To modify the bearer context associated with a DRB for a particular UE, the gNB-CU-UP transmits a Bearer Context Modification Required message through the E1 interface and receives in response a Bearer Context Modification Confirm message that confirms the modification of the bearer context. The Bearer Context Modification Required message and Bearer Context Modification Confirm message both include the new GTP TEID and TNL address to be used after modification of the bearer context, a gNB-CU-CP UE E1AP ID that uniquely identifies a UE association over the E1 interface within the gNB-CU-CP, a gNB-CU-UP UE E1AP ID that uniquely identifies a UE association over the E1 interface within the gNB-CU-UP, and a DRB ID IE that uniquely identifies the DRB.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.