Patent · US Active

Cognitive cloud migration optimizer

US10963294B2 · kind B2 · utility

7Cited by
5References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 2, 2018
Grant dateMar 30, 2021
Priority date
Expiry dateNov 1, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2009/4557
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Methods, computer program products, and systems are presented. The methods include, for instance: input data from the source environment, including application hosting data of each server in the source environment and one or more cloud type of the source environment. Candidate cloud types for target platform are listed and servers of the source environment are screened for eligibility for the migration. The target platform is selected by applying preconfigured selection rules on the application hosting data of each eligible server in the source environment. Migration recommendations for each eligible server in the source environment, including selected cloud type corresponding to the target platform, are produced.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.