Techniques and architectures for protection of efficiently allocated under-utilized resources
US10963311B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 30, 2016 |
| Grant date | Mar 30, 2021 |
| Priority date | — |
| Expiry date | Mar 14, 2037 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F9/505
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A computing environment having a first plurality of executing processes being executed by one or more processors. The executing processes each have associated resources. The executing processes utilize the associated resources. A consumed portion of a resource that is utilized by a selected executing process from the first plurality of executing resources is determined. An unconsumed portion of the resource is estimated. A first preselected amount of the unconsumed portion is allocated for utilization by a process not in the first plurality. A second preselected amount of the unconsumed portion is reserved as a fence between the consumed portion and the allocated first preselected amount of the unconsumed portion.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.