Patent · US Active

Adaptive scheduling for edge devices and networks

US10972579B2 · kind B2 · utility

0Cited by
2References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 13, 2017
Grant dateApr 6, 2021
Priority date
Expiry dateMay 9, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2009/45595
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Adaptive scheduling of compute functions in a fog network is described herein. An example method includes synchronizing kernel and hypervisor scheduling of applications used to control one or more edge devices using a global schedule, wherein the global schedule comprises timeslots for applications, and adapting the timeslots in real-time or near real-time based on application-based time related feedback that is indicative of time delays.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.