Patent · US Active

Reliability determination of workload migration activities

US10990452B2 · kind B2 · utility

0Cited by
0References
11Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 19, 2018
Grant dateApr 27, 2021
Priority date
Expiry dateJan 25, 2039

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/008
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Techniques for determining reliability of a workload migration activity are disclosed. In one embodiment, sub-tasks associated with the workload migration activity may be determined. Further, statistical data associated with an execution of the sub-tasks corresponding to different instances of the workload migration activity may be retrieved. Furthermore, a reliability model may be trained through machine learning using the statistical data to determine reliability of the workload migration activity. Then, the reliability of a new workload migration activity may be determined using the trained reliability model.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.