Optimizing background tasks based on forecast data
US11003491B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 21, 2018 |
| Grant date | May 11, 2021 |
| Priority date | — |
| Expiry date | Jan 19, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06N5/01
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
Techniques for optimizing background tasks based on forecast data are described. Customer workloads may be monitored by a local monitor in a first time period. Future customer workloads in a second time period following the first time period may be forecast based at least on the customer workloads using a local model. A background availability may be determined based at least on the future customer workloads. Execution of at least one background workload may be scheduled to use the background availability during the second time period. The local monitor may then cause the execution of the at least one background workload.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.