Patent · US Active

Building energy optimization system with economic load demand response (ELDR) optimization and ELDR user interfaces

US11022947B2 · kind B2 · utility

21Cited by
15References
21Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 8, 2018
Grant dateJun 1, 2021
Priority date
Expiry dateNov 18, 2038

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S50/14
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

An energy optimization system for a building includes a processing circuit configured to generate a user interface including an indication of one or more economic load demand response (ELDR) operation parameters, one or more first participation hours, and a first load reduction amount for each of the one or more first participation hours. The processing circuit is configured to receive one or more overrides of the one or more first participation hours from the user interface, generate one or more second participation hours, a second load reduction amount for each of the one or more second participation hours, and one or more second equipment loads for the one or more pieces of building equipment based on the received one or more overrides, and operate the one or more pieces of building equipment to affect an environmental condition of the building based on the one or more second equipment loads.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.